Therme St. Kanzian
Aerial view of Klopeiner See with jetties, boathouses and the project site

Klopeiner See

Scroll

St. Kanzian at Klopeiner See

Therme St. Kanzian is located in the picturesque municipality of St. Kanzian am Klopeiner See, in the heart of Carinthia (Kärnten) in southern Austria.

Nestled between warm alpine lakes and the gently rolling foothills of the Eastern Alps, this region is one of Austria’s most scenic and fast-growing leisure and tourism destinations.

Regional map showing the location of Therme St. Kanzian
Site plan of the development

Why Here?

Prime Location

Klopeiner See is one of Austria’s most visited lake regions, perfect for expanding beyond summer with a thermal resort.

Excellent Access

Thanks to the new infrastructure (Koralmbahn), the area connects to Graz in 35 minutes, with Vienna and international airports close behind.

Growth Potential

Wellness tourism is booming. This project is expected to generate strong economic value and attract both local and foreign visitors all year.

3D Virtual tour

Excellent Accessibility

Improved rail infrastructure makes access to St. Kanzian more efficient and attractive for both domestic and international visitors. With the opening of the new ÖBB Koralmbahn and the expansion of services, travel times have been significantly reduced.

  • From Graz by trainunder 35 minutes
  • From Klagenfurt by trainunder 15 minutes

From the regional station, local buses and shuttle services connect travellers directly to St. Kanzian and surrounding destinations — flexible, eco-friendly mobility without a car.

Aerial view of Therme St. Kanzian with Klopeiner See beyond

Total Development Area

The entire development site for Therme St. Kanzian, which includes a thermal spa, a 4-star superior hotel and an apartment hotel, spans approximately 50,000 m² of prime lakeside land near Lake Klopein in Carinthia. The site stretches 600 meters.

This spacious site allows for a phased, landscape-integrated development, with each component strategically positioned to take advantage of the natural slope and lake views.

Physical model of the whole site with spa, hotel and apartment hotel

Year-round operation

365 days, four seasons

Klopeiner See lives off the summer. As Europe’s warmest bathing lake it fills the village from June to September — and empties it again afterwards. A thermal spa does not extend that season; it removes it.

A facility open 365 days a year changes the arithmetic for everyone: restaurants, accommodation, retail and the people who work in them gain a full year instead of a summer. That is the difference between seasonal work and permanent jobs — and it is the project’s real value to the village and the region.

  • Regional value added per year€44M
  • Jobs, direct and indirectover 1,140
  • Year-round beds500

Figures from the Province of Carinthia’s analysis. Planning status — the project remains subject to official approvals.

Rendering of the thermal spa looking out across the terraces

For the village

What St. Kanzian gains

A project this size changes a municipality. For that to be felt in daily life rather than only in a balance sheet, access for local people is provided for in the operating concept — as a fixed part of operations, not as a gesture.

Equally important: the zoning is directed at tourism use only; second homes are excluded. The site stays in tourist use and will not become a quarter that sits empty in November.

A generous forecourt lies in front of the main entrance. It is not only an arrival space: it is available to the municipality through the year for events and local occasions.

  • School swimmingfixed allocations for the municipality’s schools
  • Club sporttraining times in the 25-metre pool
  • Municipality of St. Kanzianits own allocation
  • Local residentsreduced admission rate
  • Forecourtspace for municipal events through the year
  • E-mobilitycharging points for electric vehicles
  • Public transportbus stop around 100 m from the entrance
Entrance plaza with slide tower and outdoor pools

Project status

Where the project stands

A development of this size runs through a multi-stage approval process. This overview shows what is complete and what is still outstanding.

  1. 2023 Complete

    Project start

    Concept development, feasibility study and site selection in the eastern bay of Klopeiner See.

  2. 2024 Complete

    Architecture and design

    Schulz Architektur and BlendRaum develop the landscape-integrated concept.

  3. 2024 Q4 Complete

    Rezoning application

    Application for designation as a dedicated spa area. Secondary residences are excluded.

  4. 2025 Complete

    Site decision

    The Province of Carinthia and the tourism board back the eastern bay. Discussions on the future operation of the spa and hotel begin.

  5. 2026 July Complete

    Council decision

    St. Kanzian municipal council approves the civil-law contracts covering construction and operating obligations.

  6. Open In progress

    Approval and rezoning

    The contracts require approval by the Province of Carinthia, followed by rezoning.

  7. Thereafter

    Construction

    Construction begins once approval and rezoning are in place.

  8. from 2030

    Opening

    Completion is expected in 2030 at the earliest.

As of August 2026. The project remains subject to official approvals; dates may change as the process continues.